# SV Major Upgrades

> Detailed procedure for Super Validator operators performing a non-backwards-compatible Canton software upgrade with synchronizer downtime.

For supporting non-backwards-compatible major version upgrades of the
Canton software the Global Synchronizer uses, the SV operatores follow
the procedure for synchronizer (i.e., domain) upgrades with downtime
described below.

## Overview

1. Canton releases containing breaking changes become available and
   Splice releases compatible with these Canton releases become
   available.
2. SVs agree and eventually confirm via an on-ledger vote (cast via the
   SV UI) on which specific date and time the network downtime
   necessary for the upgrade will start. It is the responsibility of
   the DSO to make sure that validator operators are informed about
   planned upgrades and upgrade timelines.
3. Once the downtime has been scheduled, all SVs deploy new Kubernetes
   pods containing the new versions of the Canton components of their
   Super Validator node (participant, sequencer, and mediator) as well
   as a new CometBFT node, alongside the old versioned ones which are
   not yet deleted. See `sv-upgrades-deploying-domain`.
4. At the start of the downtime window, the SV app of SVs automatically
   pauses all traffic on the operating version of the global
   synchronizer.
5. Shortly after pausing traffic on the global synchronizer (there is a
   short delay to ensure that all components have synced up to the
   final state of the existing synchronizer), the node software of SVs
   and validators automatically exports so-called migration dumps to
   attached Kubernetes volumes. See `sv-upgrades-dumps`.
6. SV operators verify that their nodes have caught up to the
   now-paused global synchronizer. See `sv-upgrades-catching-up`.
7. All SVs and validators previously using the now-paused global
   synchronizer create full backups of their nodes. (Both for disaster
   recovery and for supporting audit requirements). See `sv_backups`.
8. All SVs upgrade theirs CN apps pods. See
   `sv-upgrades-deploying-apps`.
9. Upon (re-)initialization, the SV node backend automatically consumes
   the migration dump and initializes all components based on the
   contents of this dump. The process is analogous for validators,
   where the validator app is tasked with importing the dump and
   initializing components. App databases are
   *preserved*.
10. Once a BFT majority (i.e., >⅔) of SVs have initialized their
    upgraded nodes, the new version of the synchronizer (with an
    incremented migration ID and, typically, a new version of the core
    Canton components) becomes operational automatically. The end of the
    downtime window is therefore determined by the speed at which a
    sufficient number of SVs complete the necessary deployment and
    initialization steps.
11. The remaining (Canton and CometBFT) components of the old
    synchronizer can be retired now. We recommend to only do so after
    (non-super) validators have had sufficient time to
    *catch up* to the latest state from before the
    pause.

## Technical Details

The following section assumes that the SV node on the original
synchronizer was deployed using the instructions in `sv-helm`.

### State and Migration IDs

Synchronizer upgrades with downtime effectively clone the state of the
existing synchronizer, with some finer points:

* All *identities* are reused, which includes
  all party IDs, all participant, sequencer and mediator (node)
  identities, as well as CometBFT node identities. This is realized
  through exporting and importing a
  *migration dump*.
* Active ledger state is preserved. This is also realized through
  exporting and importing a *migration dump*.
* Historical app state in SV, validator and scan (such as transaction
  history) is preserved. Note however, that the transaction history
  exposed by the participant is not preserved and the participant will
  only serve history going forward. This is realized through
  persisting and reusing the (PostgreSQL) databases of the SV node
  apps (`sv`, `scan`, `validator`).
* The CometBFT blockchain is **not** preserved. The upgraded
  synchronizer starts with a fresh CometBFT chain. CometBFT node state
  from the existing synchronizer is discarded.

For avoiding conflicts across migrations, we use the concept of a
migration ID:

* The migration ID is 0 during the initial bootstrapping of a network
  and incremented after each synchronizer upgrade with downtime.
* The SV node apps (`sv`, `scan`, `validator`) are aware of the
  migration ID and use it for ensuring the consistency of their
  internal stores and avoiding connections to nodes on the "wrong"
  synchronizer.
* The SV node Canton components (participant, sequencer, mediator) are
  **not** directly aware of the migration ID. To keep Canton
  components apart across migrations (new Canton components are needed
  to upgrade across non-backwards-compatible changes to the Canton
  software), we deploy them with migration ID-specific names and
  ingress rules (see `sv-upgrades-deploying-domain`). We furthermore
  configure Canton components to create and use migration ID-specific
  (PostgreSQL) database names. As part of
  `sv-upgrades-deploying-apps`, the SV app will initialize Canton
  components based on its configured migration ID.
* The SV node CometBFT component is aware of the migration ID - it is
  used for forming the CometBFT chain ID.

### Migration Dumps

Migration dumps contain identity and transaction data from all of an
SV's Canton components (participant, sequencer, and mediator) connected
to the global synchronizer that is being upgraded. When using the
official Helm charts and following the
*Helm-based deployment documentation*, the migration dump is
automatically created once a scheduled synchronizer upgrade begins and
the existing synchronizer has been paused. As part of the Helm-based
deployment of the SV app (`splice-sv-node`), a persistent Kubernetes
volume is attached to the `sv-app` pod and configured as the target
storage location for migration dumps. When redeploying the SV app as
part of the migration process (see `sv-upgrades-deploying-apps`), the SV
app will automatically consume the migration dump and initialize new
components (see `sv-upgrades-deploying-domain`) based on the contents of
this dump.

### Deploying new Canton Components and CometBFT Node

Repeat the steps described in `helm-sv-install` for installing the
participant, sequencer, mediator and CometBFT components, substituting
the migration ID (`MIGRATION_ID`) with the target migration ID after the
upgrade (typically the existing synchronizer's migration ID + 1).

While doing so, please note the following:

* You don't need to wait for the existing synchronizer to have paused
  before performing these steps. Performing them well in advance of
  the scheduled downtime can reduce the downtime (s.a.
  `sv-upgrades-testing-preparation`).
* Please make sure to pick the correct (incremented) `MIGRATION_ID`
  when following the steps.
* Please make sure that all new Helm charts you install as part of
  this step have the expected Helm chart version; during an actual
  upgrade this version will be different from the one on your existing
  deployment.
* Please don't uninstall any Helm charts installed as part of the
  original deployment run (with the smaller migration ID). We
  deliberately keep SV participants and core synchronizer components
  running longer so that validators get a chance to sync up to the
  latest state from before the pause, which they need to do for
  successfully completing their part of the migration.
* Note that repeating the process with the incremented migration ID
  will result in the deployment of new pods with new Canton components
  and a new CometBFT node. Among other things, these deployments
  differ in k8s-internal host names, which are formed based on the
  migration ID.
* We recommend disabling CometBFT
  *state sync* while going through a
  synchronizer migration, to reduce dependencies on the readiness of
  other SVs. To do so, please modify the file
  `splice-node/examples/sv-helm/cometbft-values.yaml` so that
  `stateSync.enable` is set to `false`.
* Please ensure that your ingress rules are extended accordingly to
  accommodate the new pods. Revisit `helm-sv-ingress` with the updated
  migration ID in mind.
* Note that the exposed CometBFT port and CometBFT `externalAddress`
  are changed due to a limitation in CometBFT. There is no fundamental
  need to use the port numbers suggested in the runbook, the only
  requirement is that either the (external) host IP of the CometBFT
  pod must be different for each migration ID or its (external) port
  number.

### Catching Up Before the Migration

In order for the migration to the new synchronizer to be safe and
successful, it is important that the SV node is fully caught up on the
existing synchronizer before proceeding to `sv-upgrades-deploying-apps`.

* For making sure that the SV participant has caught up and the
  *migration dump* has been created as expected,
  operators can check the logs of the `sv-app` pod for the message
  `Wrote domain migration dump`.
* For making sure that alls apps - `sv-app`, `scan-app`, and
  `validator-app` - have caught up, operators can check the logs of
  the respective pods for `Ingested transaction` messages. If the
  latest such message for a given app is 10 or more minutes old, that
  app has very likely (with a large safety margin) caught up to the
  state on the participant, and hence to the state of the existing
  (paused) synchronizer.

### Updating Apps

Repeat the steps described in `helm-sv-install` for installing the `sv`,
`scan` and `validator` components, substituting the migration ID
(`MIGRATION_ID`) with the target migration ID after the upgrade
(typically the existing synchronizer's migration ID + 1).

While doing so, please note the following:

* Please make sure to pick the correct (incremented) `MIGRATION_ID`
  when following the steps.
* Please modify the file `splice-node/examples/sv-helm/sv-values.yaml`
  so that `migration.migrating` is set to `true`. This will ensure
  that the SV app will consume the migration dump and initialize new
  components based on the contents of this dump. Also set
  `migration.legacyId` to the value of migration ID before
  incremented. (`MIGRATION_ID` - 1).
* Use `helm upgrade` in place of `helm install` for the `sv`, `scan`
  and `validator` charts and do not uninstall any Helm charts
  installed as part of the original deployment run (with the smaller
  migration ID).
* Please make sure that all Helm chart deployments you upgrade as part
  of this step are upgraded to the expected Helm chart version; during
  an actual upgrade this version will be different from the one on
  your existing deployment.
* No ingress rules need to be updated as part of this step. Once the
  redeployment is complete the existing ingress rules will apply to
  the updated pods.

Once you have confirmed that the migration has been successful:

* Please change the `migration.migrating` value on the `sv` chart back
  to `false`.

### Recovering from a failed upgrade

In the event of a failed upgrade, Each SV must submit a topology
transaction to resume the old synchronizer. This can be triggered using
the following command:

```bash theme={"theme":{"light":"github-light","dark":"github-dark"}}
    curl -X POST "https://sv.sv.YOUR_HOSTNAME/api/sv/v0/admin/domain/unpause" -H "authorization: Bearer <token>"

```

where <span class="title-ref">\<token></span> is an OAuth2 Bearer Token
obtained from your OAuth provider. For context, see the Authentication
section *here*.

The command will complete successfully once a sufficient number of SVs
have executed it. The old synchronizer will then be un-paused.

## Organizational Details

### Coordination calls

For keeping upgrade downtimes short and assisting with the quick
resolution of individual issues, we propose to perform upgrades and
*upgrade tests* in a synchronized manner, with
coordination over a group call (Zoom meeting). All SV operators will
hereby be invited to join a call that starts shortly before the
beginning of the downtime window (step 4 above) and ends once the
upgrade and synchronizer migration has concluded (step 10 above). Our
aim is that the core of the upgrade procedure (steps 4-10) can in
principle be completed within one hour, realizing that the first
coordinated tests will likely take longer.

Each SV must be represented in these calls by at least one person that
is capable of performing the steps described in
`sv-upgrades-deploying-domain` and `sv-upgrades-deploying-apps`. The
operators representing an SV must be:

* Familiar with the technical details around the SV’s deployment.
* Capable (in terms of both skills and permissions) to interact with
  the SV’s node deployment via Helm and (for debugging with support
  from the CN team) Kubernetes (kubectl) commands.
* For being able to amend potential errors during
  *preparation*: Capable (in terms
  of both skills and permissions) to register new ingress rules for
  internal synchronizer components (sequencer, mediator and CometBFT)
  and SV participants. Resulting addresses will only be relevant to
  technical personnel and will follow a schema such as
  `component-migrationId.hostname`. Note that for fully supporting the
  migration flow for CometBFT nodes, it will also be necessary to
  allow communication over additional ports.

<div class="todo" markdown="1">
  update this with references to the GSF processes, which are now being
  used to run these calls
</div>

## Testing

The success of synchronizer upgrades and the duration of downtime both
depend on the effectiveness of all SVs in performing the necessary
upgrading steps. We therefore recommend that the DSO performs
*coordinated tests* before attempting
an upgrade on MainNet. Mirroring the recommended process for an actual
upgrade, we also recommend that SVs perform
*preparation* steps in advance of
every coordinated test.

### Individual Preparation

The following steps can be performed before the downtime window has
started and even before a synchronizer upgrade has been formally
scheduled:

1. Ensure that the *backup and restore* process for the SV
   works as expected.
2. Deploy a new version of the CometBFT component as per
   `sv-upgrades-deploying-domain` (`MIGRATION_ID += 1` compared to the
   currently active synchronizer), including setting up the ingress for
   this component. Ensure that the pod reports as healthy. For checking
   that the ingress rules are set up correctly, ensure that TCP
   connections to the new CometBFT port are possible, for example by
   using the `nc` command: `nc -vz <cometbft host> <cometbft port>`.
3. Deploy new versions of the Canton components (participant,
   sequencer, mediator) as per `sv-upgrades-deploying-domain`
   (`MIGRATION_ID += 1` compared to the currently active synchronizer),
   including setting up the ingress for the new sequencer. Note that
   these components are only initialized by the SV app once the
   synchronizer migration has started. Ensure that all pods report as
   healthy. Note that when using `grpcurl` to check that the ingress
   rule for the new sequencer is set up correctly (as described in
   `helm-sv-ingress`), you will get a `rpc error: code = Unavailable`
   error as the sequencer is not yet initialized (and its public gRPC
   endpoint is therefore not yet available). If the rpc error details
   include a `delayed connect error: 111` message, this is an indicator
   that the ingress rule is set up correctly.

We recommend that all SVs perform these steps before a
*coordinated test* starts and signal
their readiness once they have done so.

### Coordinated Tests

Coordinated tests mirror the steps that will later be used for upgrading
MainNet (see *above*). Specifically, coordinated
tests involve:

* Scheduling a *group call* covering the
  planned synchronizer downtime.
* Pausing the global synchronizer via a governance vote.
* Each SV making sure that all of its node's components have caught up
  to the final state of the existing synchronizer - see
  `sv-upgrades-catching-up`.
* Creating full backups of SV nodes after they have fully caught up
  and the synchronizer has been paused.
* Performing all remaining deployment steps necessary for a successful
  migration to the new synchronizer. If
  `sv-upgrades-testing-preparation` was followed, this involves only
  the steps outlined in `sv-upgrades-deploying-apps`. It is fully
  supported that SVs perform these deployment steps concurrently after
  the synchronizer has been paused.
* Each SV verifying that its local state is consistent with the state
  of the global synchronizer before the pause. For example, verifying
  that their own coin balance is as expected.
* Once all SVs (or a governance threshold of SVs) have completed the
  migration: Collectively verifying that the new synchronizer is
  healthy and operational. Synchronizer health can be inferred from
  monitoring signals such as timely `SV Status Reports` from all SVs.
* Agreeing on a timeline for decommissioning the Canton and CometBFT
  nodes connected to the original (pre-migration) synchronizer.
* Before we decommission the Canton and CometBFT nodes connected to
  the original (pre-migration) synchronizer, we should remove
  `migration.legacyId` we have set previously in the file
  `splice-node/examples/sv-helm/sv-values.yaml`.

We recommend to perform at least one coordinated test on TestNet, with
the exact same configuration and versions that will be used for the
upgrade on MainNet, before scheduling a MainNet upgrade with downtime.

## Cleanup in the event of failure

In rare occasions, where the upgrade is not successful but the apps
manage to start ingesting from the new migration id, the apps' databases
might contain data of the failed migration id that should be removed. To
check whether any such data has been stored, you can query all of the
apps' databases (that is: validator, scan and sv apps) with the
following query:

```sql theme={"theme":{"light":"github-light","dark":"github-dark"}}
    select *
    from update_history_last_ingested_offsets
    where history_id = (select distinct history_id from update_history_last_ingested_offsets)
      and migration_id = ?;

```

Replace the migration\_id parameter with the migration\_id for which the
upgrade procedure just failed.

If no rows are returned by the query in any of the apps' databases, that
means that nothing was ingested and thus the app databases do not
contain any invalid data.

If a row is returned, that means that data was ingested that should be
purged. The easiest way is to restore the backup that was taken as part
of the upgrade process (as per `sv_backups`) for the validator, scan and
SV apps and drop the databases of the failed migration id for sequencer,
mediator and participant.